As part of our FCIM program, we supported the plant team in removing constraints in its tape winding process. Throughput and line speed rose without adding equipment, adding $1.7M in gross profit.
Rebuilt in-plant logistics around a disciplined pick process
We embedded to manage the in-plant logistics team, redesigned the picking process and material replenishment, and stood up PFEP and daily management across a growing footprint — keeping parts flowing to the assembly lines on time.
Turned MRP exception messages into recovered dollars
Planners were working supply-chain exception messages by hand and chasing suppliers across systems. We built a custom application that surfaces actionable exceptions, drafts the supplier communication, and tracks the value resolved — with results visible in a live dashboard.
An embedded FCIM installed a weekly roadmap cadence and Project A3 discipline. Improvement projects now carry their own business cases and runtime savings charts — and the client's team drives them, week after week.
$250K/yr
Savings on track (annualized)
Weekly
Roadmap + A3 cadence
$0
Capital required
Wire & cable manufacturer · Consulting (FCIM)
Connected the shop floor to the P&L with a KPI tree
We built a KPI tree linking 70+ floor-level metrics to a handful of business KPIs, then standardized work instructions, training records, and CRM use — so gains are measurable and repeatable. The engagement was held up as a benchmark across the owner's portfolio.
More density from the same warehouse — and a scheduler built in a day
We completed a PFEP and added rack density to absorb new parts without a new building, stood up a digital daily-leadership dashboard, and prototyped a drag-and-drop production scheduler to replace spreadsheet-and-gut planning.
No new building
Capacity added in place
1 day
Scheduler prototype built
Live
Daily-leadership dashboards
Across the FCIM portfolio · Consulting
The same rhythm, repeated across plants
The FCIM model — weekly roadmap, disciplined A3s, and real accountability — runs across a portfolio of mid-market manufacturers. It isn't heavy lifting; it's structure, applied consistently. The results follow.
2×
Picking output
+93%
On-time delivery
3×
Monthly revenue output
Outcomes from real Allied engagements. Client names withheld; industry descriptors used in their place. Most gains were achieved with little or no capital investment.
"Allied Advisors was instrumental in driving positive change by coming in and managing our in-plant logistics team. They provided the necessary management and leadership to implement material-replenishment strategies to save time and cost in delivering parts to our assembly processes."
Director of Operations — a global material-handling OEM